Turnover · Engineering (ETOP)
Engineering turnover packs, built from the record already there.
Design, construction and commissioning records compile into the pack automatically.
An engineering turnover pack should not mean reconstructing a project's history at the end of it. Because design approvals, construction records and commissioning sign-offs were captured against the drawing as they happened, the pack compiles from what is already there. Checked, attributed and ready.
Compiled, not assembled
Error-free and GDP compliant documentation from every contractor and every discipline pulls into the pack as the project runs, so there is nothing to gather at the end.
Completion visible throughout
ETOP status is visible per system at any point in the project. You know where you stand rather than where you stood.
Checked on the way in
Because every document was checked against its requirement when it arrived, the hours usually spent on corrections and clarifications are not needed.
After handover, the engineering record stays with the facility. The reference point for every system it describes.