Turnover · System Turnover
Systems turnover right first time.
Turnover packs compile from work already done and already checked.
Sign-offs carry the right permissions for trades, contractor and asset owner. Activity dependencies mean a system cannot turn over until the process has actually been followed, and open critical punches stop it dead.
Sign-offs with the right permissions
Every turnover activity is signed by the person entitled to sign it, per trade, contractor and asset owner.
Dependencies that enforce the process
A system cannot turn over out of sequence, and critical punches block it until they are closed.
Certificates compiled automatically
Relevant certificates build into the engineering turnover pack without anyone assembling them, with ETOP and VTOP status visible side by side.
After handover, the packs stay in the record with everything behind them, for the people who run the facility.